Foundation
- Driven Pile
Driven Pile is concrete pile or steel pipe in which the installation process by being hit (with Diesel Hammer, Hydraulic Hammer), pressing it (with Hydraulic Static Pile Driver/Jacking Pile), or vibrated (with Vibro Hammer).
- Bored Pile
Bored Pile is an inner foundation structure in which the installation process is by making a drill hole until the depth planned with temporary casing system, full casing system, or drilling mud system (bentonite slurry/polymer). Then, put the steel reinforcement into the drilling hole. The final stage is filled with concrete ready mix. Capacity of each bored pile can be made larger than driven pile.
- Barrette Pile
Barrette piles is an inner foundation structure on which the structure can be made with a variety of rectangular shapes that can forward the loads directly from the upper structure to the ground layer. Capacity of this foundation structure can be made larger than driven pile or bored pile.